WE DELIVER ANYWHERE IN NORTH AMERICA · 9 BRANCHES

PVC Decking · Material Planning

PVC Decking: Plan Delivery, Storage and Jobsite Access

Receiving and managing PVC decking materials at your jobsite requires careful planning to protect your investment and ensure a smooth installation. Unlike traditional lumber, PVC decking has distinct handling and storage requirements that, if overlooked, can lead to damage, delays, or unnecessary costs. This guide focuses on the critical decisions and preparations you need to make before your PVC decking arrives.

From coordinating delivery truck access to understanding proper stacking techniques, each step in the logistics chain contributes to the success of your project. We'll walk through how to anticipate potential challenges and set up your site for efficient material flow, helping you avoid common pitfalls and keep your project on schedule.

TimberTech Advanced PVC poolside deck with lounge seating and a privacy fence
TimberTech Advanced PVC project reference; verify your selected assembly.

Why Proper Logistics Matter for PVC Decking

PVC decking, being a synthetic material, offers advantages like water resistance and dimensional stability, but it also has specific handling needs. While it is generally lighter than hardwood or composite decking, its flexibility can mean boards need proper support during transport and storage to prevent bowing or warping. Protecting the surface from scratches or impacts before installation is also crucial to maintain its aesthetic integrity. Thoughtful planning for delivery and staging helps preserve the material's condition and simplifies the installation process.

Effective logistics also contribute to jobsite safety. Properly stored materials reduce tripping hazards and ensure clear pathways for workers. By addressing these considerations upfront, you can minimize material waste, avoid unexpected delays, and ensure your PVC decking project starts on the right foot.

PVC decking from Azek and TimberTech Azek is 100% synthetic and waterproof to the core. This makes it a suitable choice for docks and pool decks, as it resists issues like swelling, staining, or rot that can affect wood-based materials. Its lighter weight compared to hardwood and some composite options can make handling easier on the jobsite, particularly for rooftop work.

Pre-Delivery Site Assessment and Access Planning

Before your PVC decking arrives, conduct a thorough site assessment to identify potential access challenges for the delivery truck. Consider the width and clearance of driveways, gates, and any overhead obstructions like power lines or tree branches. If your jobsite has limited access, you may need to arrange for a smaller delivery vehicle or plan for offloading at a nearby staging area and then transporting materials to the site.

Verify the delivery truck's turning radius and the available space for maneuvering. Communicate any access restrictions or specific instructions to your material supplier in advance. Confirm the delivery window and ensure someone is available on-site to receive and inspect the materials. A clear, level path from the delivery point to your designated storage area will also facilitate efficient offloading.

Choosing a Suitable Storage Location

The ideal storage location for PVC decking should be flat, dry, and protected from direct sunlight, extreme temperatures, and potential damage. While PVC decking is waterproof, storing it off the ground helps prevent dirt accumulation and allows for air circulation. Consider a covered area like a garage, shed, or under a tarp secured to prevent wind uplift.

Avoid storing decking directly on asphalt or dark surfaces that can absorb and radiate excessive heat, as prolonged exposure to high temperatures can potentially affect the material's shape. If outdoor storage is unavoidable, ensure the area is well-drained and elevate the bundles using dunnage (spacers) to keep them off the ground. The goal is to maintain the boards in their original, flat condition until they are ready for installation.

Proper Stacking and Support Techniques

When stacking PVC decking, always follow the manufacturer's guidelines for support and spacing. Generally, boards should be stacked horizontally on a flat, level surface, with uniformly spaced dunnage placed every 24 inches or as specified by the product documentation. This even support prevents sagging or bowing over time. Do not stack bundles too high, as excessive weight can compress lower boards.

If different board lengths are delivered, stack them separately or ensure that shorter boards are supported along their entire length. Never stack PVC decking directly on uneven ground or over unsupported spans. Overlapping dunnage vertically between layers can help distribute weight evenly and maintain proper alignment. Securing the stack with straps can also add stability, especially if the materials will be stored for an extended period.

Jobsite Material Flow and Staging

Efficient jobsite staging means positioning materials in a way that minimizes movement and maximizes productivity during installation. Instead of storing all materials in one remote location, consider staging smaller quantities of decking closer to the active work area as needed. This reduces the time and effort spent transporting boards, fasteners, and tools.

Maintain clear pathways around staged materials to ensure worker safety and easy access. Keep the storage area tidy and organized to quickly locate specific board lengths or accessories. For multi-level projects, plan how materials will be moved to higher elevations, whether through a hoist, ramp, or careful manual transfer, always prioritizing safety and material protection.

Worked Example: Staging for a 400 sq ft Deck

Consider a hypothetical project for a 400 square foot deck using 12-foot long PVC decking boards, which are typically 5.5 inches wide. This project would require approximately 73 boards (400 sq ft / (12 ft * 5.5 in / 12 in/ft) = 400 / 5.5 = 72.7 boards). If these boards are delivered in bundles of 6, you would receive roughly 13 bundles.

**Delivery Planning:** You confirm with the supplier that the delivery will be on a flatbed truck. Your driveway is 10 feet wide with no overhead obstructions. You designate a level, dry area in your backyard, approximately 15 feet by 10 feet, for storage, which is accessible via a side gate. You ensure this area is clear of debris and has enough space for the bundles.

**Storage Setup:** You prepare 4x4 lumber as dunnage, cutting pieces to 6-foot lengths. For each stack of boards, you place dunnage every 2 feet (at 0, 2, 4, and 6 feet from one end) to provide continuous support. You plan to stack no more than 4 bundles high and cover the stacks with a heavy-duty tarp, secured with bungee cords, to protect from sun and rain. You leave a 3-foot wide path around the stacks for easy access.

**Jobsite Flow:** As the project progresses, you move one or two bundles at a time from the main storage area to a temporary staging zone closer to the deck frame, minimizing long carries. This systematic approach ensures materials are protected and readily available for the installation team.

Before you order

  • Confirm delivery truck dimensions and site access (driveway width, overhead clearance).
  • Identify a flat, dry, and protected storage location for decking materials.
  • Plan for off-ground storage using dunnage (spacers) to ensure air circulation and prevent warping.
  • Verify manufacturer's specific stacking requirements for board support and height.
  • Protect materials from direct sunlight, extreme temperatures, and moisture with covers if storing outdoors.
  • Establish clear, safe pathways for material movement from delivery to storage to installation area.
  • Communicate any site restrictions or special delivery instructions to your supplier in advance.
  • Arrange for on-site personnel to inspect and receive the delivery.

Confirm installation details, approved uses and warranty terms in the current instructions for the exact product and profile. Your installer should verify the substrate, structure and applicable project requirements.

Questions to help you decide

Can PVC decking be stored directly on the ground?

It is not recommended to store PVC decking directly on the ground. While the material is waterproof, storing it off the ground using dunnage helps prevent dirt and moisture accumulation, allows for air circulation, and keeps the boards flat and stable. This practice also helps avoid potential staining from ground contact.

How long can PVC decking be stored before installation?

PVC decking can typically be stored for extended periods if kept in proper conditions. Ensure it is stored flat, supported evenly with dunnage, and protected from direct sunlight, extreme heat, and moisture. Always refer to the specific manufacturer's guidelines for long-term storage recommendations to maintain material integrity.

What should I do if my delivery access is limited?

If your jobsite has limited access for a large delivery truck, communicate this to your material supplier as early as possible. Options may include arranging for a smaller delivery vehicle, offloading materials at a more accessible nearby location and then transporting them to the site, or coordinating a specific drop-off point with the driver. Clear communication is key to avoiding delivery issues.

Request a Material Quote for Your PVC Decking Project

Ready to plan your PVC decking project? Submit your project dimensions, desired profile, and ZIP code to request a material quote. Our team can help confirm current availability and service options for your area. Explore our full range of PVC decking options and complementary materials today: <a href="/decking/pvc">PVC Decking</a>, <a href="/decking">All Decking</a>, <a href="/decking/hardwood">Hardwood Decking</a>, <a href="/decking/hardwood/ipe">Ipe Decking</a>, <a href="/decking/composite">Composite Decking</a>.

Request a material quote →

Keep planning your project