Confirming Your Order Details
Before your Bulletwood decking even ships, it's crucial to confirm all order details. This includes the exact quantity of boards, their lengths, and the specified profile. Discrepancies caught early can prevent significant issues upon delivery. Review your order confirmation carefully and cross-reference it with your project plans. This is also the time to ensure any special instructions for packaging or bundling are noted.
Bulletwood is a dense, durable hardwood. The weight of even a small bundle can be considerable, so confirming exact dimensions and quantities helps you anticipate the scale of the delivery.
Planning for Delivery Access
Consider the path the delivery truck will take to your jobsite. Are there any narrow roads, low-hanging branches, or weight restrictions? For residential deliveries, assess driveway width, overhead clearances (like power lines or tree limbs), and the turning radius required for a large delivery vehicle. If the site is remote or has challenging access, discuss these details with our team in advance.
Think about where the truck will park and unload. Will it block traffic or create safety hazards? Clear the delivery path of any obstacles such as parked cars, debris, or landscaping materials. Having a clear, level area for the truck to maneuver and unload will expedite the process and minimize potential issues.
On-Site Staging and Storage
Once the Bulletwood decking arrives, proper staging and storage are critical. Hardwood decking should be stored on a flat, level surface, ideally off the ground to prevent moisture absorption. Use wood sleepers or pallets to create an air gap beneath the material. This also helps maintain air circulation around the boards, which is important for acclimatization.
Protect the material from direct sunlight, rain, and excessive humidity. A tarp or protective covering is recommended, but ensure it allows for some airflow to prevent condensation. Avoid storing the decking directly on concrete or asphalt without a barrier, as these surfaces can transfer moisture and heat. Keep the bundles tightly strapped to prevent warping or bowing, especially if they will be stored for an extended period before installation.
Worked Example: Staging for a 200 sq ft Deck
Let's consider a hypothetical 200 square foot deck project using Bulletwood decking in 5/4 x 6-inch nominal profile boards, primarily in 12-foot lengths.
If most boards are 12 feet long, this translates to about 37 boards. Given the density of Bulletwood, a single 12-foot board of this profile can weigh around 25-30 pounds. Therefore, a delivery of 37 boards could weigh over 1,000 pounds. This volume will likely arrive in one or two bundled units, each roughly 12 feet long.
For staging, you'd need a clear, level area of at least 13 feet by 3 feet to accommodate the bundles. Lay down three to four 4x4 or 2x4 sleepers evenly spaced beneath where the bundles will rest, keeping them off the ground. Cover the bundles with a breathable tarp, ensuring air can circulate but direct rain and sun are blocked. This staging area should be as close to the work site as possible without obstructing construction activities.
Jobsite Safety and Handling
Hardwood decking can be heavy and cumbersome. Plan for adequate manpower or mechanical assistance (such as a forklift if available and appropriate for the site) for unloading and moving the material. Always lift with your legs, not your back, and wear appropriate personal protective equipment, including gloves and safety footwear.
Be mindful of sharp edges or splinters when handling raw lumber. If boards need to be moved frequently, consider using dollies or carts to minimize manual lifting. Maintain a clear and organized jobsite to prevent trips and falls, especially when dealing with long, heavy materials.
Before you order
- Have I confirmed my Bulletwood decking order details (quantity, length, profile)?
- Is the delivery route clear of obstacles and accessible for a large truck?
- Is there a level, clear area for safe unloading?
- Do I have a designated, protected storage location for the decking?
- Are there sleepers or pallets available to keep the decking off the ground?
- Do I have a tarp or covering to protect the material from sun and rain while allowing airflow?
- Have I considered the weight of the material and planned for safe handling and moving?
- Is the jobsite organized to minimize hazards during material handling?
Confirm installation details, approved uses and warranty terms in the current instructions for the exact product and profile. Your installer should verify the substrate, structure and applicable project requirements.
Questions to help you decide
How long can Bulletwood decking be stored on site before installation?
While Bulletwood is a stable hardwood, it's best to install it as soon as possible after delivery and proper acclimatization. Generally, storing it for a few weeks to a month with proper protection and ventilation is acceptable. Longer storage times increase the risk of weathering or environmental impacts.
Do I need to acclimate Bulletwood decking?
Yes, like most natural wood products, Bulletwood decking benefits from a period of acclimatization on the jobsite. This allows the wood to adjust to the local temperature and humidity conditions before installation. Store it properly, as described in the guide, for several days to a week prior to beginning your project.
Can I store Bulletwood decking directly on the ground?
No, it is not recommended to store Bulletwood decking directly on the ground. This can lead to moisture absorption, staining, and potential warping. Always use sleepers or pallets to elevate the material, ensuring proper air circulation and protection from ground moisture.