Maximo Accoya: Plan Delivery, Storage and Jobsite Access

Receiving and managing building materials at your jobsite is a critical step that impacts project timelines, material integrity, and overall efficiency. For projects using Maximo Accoya modified wood, understanding the logistics of delivery, proper storage, and jobsite access is essential. This guide helps you anticipate potential challenges and make informed decisions to ensure your Maximo Accoya arrives safely and is ready for installation.

Maximo Accoya is a modified wood product known for its stability and suitability for demanding applications. Its performance characteristics are maintained through proper handling and storage, making pre-planning for its arrival a worthwhile investment for any project. Whether you're working on decking, siding, or other exterior applications, careful material logistics contribute to a successful outcome.

Wood pool surround with pale boards beside a modern home
Maximo Accoya project reference; Accoya is acetylated wood.

Confirming Delivery Details and Site Access

Before your Maximo Accoya order ships, confirm all delivery details with Lumber Plus. This includes the exact delivery address, contact person, preferred delivery date and time window, and any specific site access limitations. If your jobsite has restricted hours, narrow entry points, or weight limits for vehicles, communicate these clearly during the ordering process.

Consider the type of delivery vehicle that will be used. Large flatbed trucks or enclosed trailers are common for lumber deliveries. Ensure your site has adequate space for the truck to maneuver, unload safely, and depart. Confirm if a liftgate service is required or if you will have equipment on site for offloading.

On-Site Storage Requirements for Maximo Accoya

Proper storage of Maximo Accoya upon arrival is crucial to maintain its quality. The material should be stored in a dry, well-ventilated area, protected from direct sunlight, rain, and ground moisture. If outdoor storage is unavoidable, cover the material with a waterproof tarp, ensuring adequate air circulation to prevent condensation.

Elevate the material off the ground using stickers or blocking to allow for airflow and prevent moisture absorption. Maximo Accoya, like other wood products, can be susceptible to surface mold or discoloration if stored in damp, stagnant conditions. Stacking the material flat and evenly supported helps prevent warping or bowing before installation.

Worked Example: Planning for a Residential Siding Project

Consider a hypothetical residential siding project for a new build. The house is located on a suburban street with a standard driveway. The Maximo Accoya siding planks are 16 feet long and arrive in bundles. The total order is for 120 bundles, weighing approximately 300 lbs each, for a total of 36,000 lbs.

**Step 1: Site Assessment.** The driveway is 10 feet wide, and the street allows for a 40-foot flatbed truck to access. There is a cleared area beside the garage, approximately 20 feet by 15 feet, which is relatively level. This area will serve as the primary staging zone.

**Step 2: Offloading Plan.** A forklift is rented for the delivery day, capable of lifting bundles. The delivery driver will position the flatbed alongside the driveway, and the forklift will transfer bundles to the designated staging area. This avoids manual handling of heavy bundles and speeds up the process.

**Step 3: Storage Preparation.** In the staging area, several 4x4 timbers are laid out on the ground, spaced every 4 feet, to create a level, elevated platform. These timbers are covered with a layer of heavy-duty plastic sheeting to create a moisture barrier. The bundles will be stacked neatly on this platform, with additional stickers between layers to promote air circulation. A large, reinforced tarp will cover the entire stack, secured to protect from sun and rain, but allowing for some ventilation at the ends.

**Step 4: Jobsite Access and Material Flow.** As siding work progresses, bundles will be moved from the main storage area to closer proximity to the installation points using a smaller utility cart. This minimizes travel time for installers and ensures material is available as needed without obstructing other construction activities.

Natural Accoya finish sample with pale boards and fine grain
Accoya natural finish reference.

Considering Equipment and Personnel for Offloading

The size and weight of your Maximo Accoya order will dictate the necessary equipment and personnel for offloading. For smaller orders, manual offloading by a crew might be feasible, but for larger quantities or longer lengths, mechanical assistance is often required. Forklifts, telehandlers, or even a crane may be necessary depending on the site and material volume.

Ensure that whoever operates the equipment is certified and experienced. Plan for sufficient labor to assist with guiding loads, inspecting materials upon receipt, and moving bundles to their designated storage location. Safety should be the top priority during all offloading operations.

Inspection Upon Delivery

Upon delivery, it is important to carefully inspect all Maximo Accoya materials. Check for any visible damage to the packaging or the wood itself, such as broken bundles, severe scratches, or evidence of moisture exposure. Count the number of bundles or pieces against your packing list and order confirmation.

Document any discrepancies or damage immediately by noting it on the delivery receipt and, if possible, taking photographs. Report any issues to Lumber Plus promptly. This inspection process helps ensure that you receive the correct quantity and quality of material for your project.

Before you order

  • Have I confirmed the exact delivery address and preferred date/time with Lumber Plus?
  • Are there any site access restrictions (e.g., narrow roads, weight limits, restricted hours) that need to be communicated?
  • Do I have adequate space for the delivery vehicle to maneuver and unload safely?
  • What equipment (e.g., forklift, crane) or personnel will be needed for offloading?
  • Is there a designated, dry, and level area for storing Maximo Accoya?
  • Do I have materials (e.g., timbers, plastic sheeting, tarps) to properly elevate and protect the material from moisture and sun?
  • Who will be responsible for inspecting the delivery and documenting any issues?
  • What is the plan for moving materials from the storage area to the installation point?

Confirm installation details, approved uses and warranty terms in the current instructions for the exact product and profile. Your installer should verify the substrate, structure and applicable project requirements.

Questions to help you decide

How long can Maximo Accoya be stored on site before installation?

Maximo Accoya can be stored on site for an extended period if proper storage guidelines are followed. Keep it elevated, covered, and well-ventilated, protected from direct weather exposure and ground moisture. While specific durations depend on site conditions, aim to install within a reasonable timeframe after delivery for best results and to minimize handling.

Can Maximo Accoya be stored outdoors?

Yes, Maximo Accoya can be stored outdoors, but it must be properly protected. Elevate the material off the ground with stickers, cover it with a waterproof tarp to shield it from rain and direct sunlight, and ensure there is adequate air circulation to prevent moisture buildup and potential discoloration. Avoid storing it directly on soil or wet surfaces.

What should I do if my Maximo Accoya order arrives damaged?

If your Maximo Accoya order arrives damaged, note the damage clearly on the delivery receipt before the driver leaves. Take photographs of the damaged material and packaging. Then, contact Lumber Plus immediately with your order details and documentation so they can assist with resolving the issue.

Request a Quote for Maximo Accoya

Ready to plan your next project with Maximo Accoya? Provide your project dimensions, desired profile, and ZIP code to request a material quote. We can also confirm current availability and service options for your location.

Request a material quote →