Confirming Maximo Accoya Profiles and Dimensions
Before any order is placed, a precise agreement on the Maximo Accoya profiles and dimensions is essential. Maximo Accoya is available for various applications, including decking, siding, ceilings, trim, and molding. Each application may have specific profile options.
Work with your contractor to review the chosen profile drawings and confirm the exact dimensions for each element of your project. This includes not just the face width and thickness, but also any specific milling details for jointing, reveals, or fastening systems. For example, a rainscreen siding assembly will require specific profile dimensions to ensure proper drainage and ventilation gaps.
Consider the overall length requirements. While Maximo Accoya is available in various lengths, optimizing for standard lengths can sometimes reduce waste and simplify installation. Discuss with your contractor how they plan to lay out the material to minimize cuts and maximize the use of full boards.
Finalizing Color and Finish Selection
Maximo Accoya is available in several appearances, including Maximo Accoya Grey, Ipe Brown, and Natural. Digital representations are references only. It is crucial to review a current physical sample with your contractor to confirm the final color and finish selection.
Discuss how the chosen finish will interact with other materials on the project and how it will appear under different lighting conditions. Also, confirm any project-specific finishing requirements, such as pre-finishing for all sides of boards or specific sealants, which might influence the material order or installation timeline.
Quantifying Material Needs: A Worked Example
Accurate quantity calculation is paramount. Let's consider a hypothetical wall cladding project using Maximo Accoya siding. Suppose you have a wall section that is 10 feet tall and 20 feet wide, for a total area of 200 square feet. You've selected a Maximo Accoya siding profile with a 5.5-inch (0.458 feet) exposed face width.
To calculate the linear footage needed: Divide the total area by the exposed face width (200 sq ft / 0.458 ft = 436.68 linear feet).
Now, consider waste factor. For most siding projects, a 10-15% waste factor is prudent to account for cuts, defects, and future repairs. Using a 10% waste factor: 436.68 linear feet * 1.10 = 480.35 linear feet.
If Maximo Accoya is typically supplied in 12-foot lengths, you would divide the total linear footage by the board length: 480.35 linear feet / 12 feet/board = 40.03 boards. Since you can only purchase full boards, you would round up to 41 boards.
This is a simplified example. Your contractor will account for specific details like window and door openings, corner details, and jointing patterns. Ensure your contractor provides a detailed material takeoff that includes these considerations and a calculated waste factor, then review it together.

Accessory and Fastener Coordination
Maximo Accoya projects often require specific accessories and fasteners. This includes compatible clips, screws, sealants, and possibly sub-framing materials if not already specified. Your contractor should identify all necessary associated products.
Discuss the type of fasteners (e.g., stainless steel screws), their size, and the quantity needed based on the chosen fastening method and spacing. Confirm that all accessories are compatible with Maximo Accoya and the intended installation environment, especially for exterior applications where corrosion resistance is important.
Logistics and Site Preparation
Even before ordering, discuss the logistics of material delivery and site preparation. Where will the material be stored on site? How will it be protected from weather and job site damage? Maximo Accoya should be stored flat, off the ground, and covered to protect it until installation.
Your contractor should also confirm that the job site is ready to receive the material, including sufficient space for staging and proper sub-structure readiness. Any special handling instructions for long lengths or large quantities should be communicated.
Reviewing Project Documentation and Timelines
Before placing the order, review all relevant project documentation with your contractor. This includes architectural drawings, installation guidelines for Maximo Accoya, and any project-specific details. Confirm that all parties understand the proposed installation methods and any specific requirements for movement joints or ventilation.
Establish a clear timeline for material delivery, installation commencement, and completion. This ensures that the Maximo Accoya arrives on site when needed, avoiding delays and keeping the project on schedule.
Before you order
- Have we confirmed the exact Maximo Accoya profile(s) and dimensions for all applications (e.g., siding, decking, trim)?
- Have we reviewed and approved a physical sample for the chosen Maximo Accoya color (Grey, Ipe Brown, Natural) and any specific finish requirements?
- Has the contractor provided a detailed material takeoff, including waste factor, for my review and approval?
- Are all necessary accessories and fasteners (clips, screws, sealants) identified and specified for compatibility with Maximo Accoya?
- Is the plan for material delivery, on-site storage, and protection from weather and damage clear and agreed upon?
- Have we reviewed project drawings and Maximo Accoya installation guidelines to confirm installation methods and details?
- Is there a clear timeline for material ordering, delivery, and installation commencement?
Confirm installation details, approved uses and warranty terms in the current instructions for the exact product and profile. Your installer should verify the substrate, structure and applicable project requirements.
Questions to help you decide
Why is a physical sample important for Maximo Accoya?
Digital images of wood products, including Maximo Accoya, can vary significantly from the actual material due to screen calibration, lighting, and natural wood variations. A physical sample allows you and your contractor to assess the true color, grain, and texture under real-world lighting conditions, ensuring the final product meets your aesthetic expectations.
What is a 'waste factor' in material ordering?
A waste factor is an additional percentage of material added to the calculated net quantity to account for necessary cuts, trimming, mistakes, or potential material imperfections. For wood products like Maximo Accoya, a waste factor of 10-15% is common, but it can vary based on the complexity of the project, board lengths, and the contractor's experience. It helps ensure enough material is on hand to complete the project without delays for reordering.
Can Maximo Accoya be custom-milled?
Maximo Accoya is available for custom milling. If your project requires unique profiles or dimensions beyond standard offerings, discuss these requirements with your contractor and Lumber Plus. Custom milling can affect lead times and costs, so it's important to specify these details early in the planning process.
Ready to Plan Your Maximo Accoya Project?
Request a material quote with your project dimensions, exact profile, and ZIP code. We can help confirm current availability and service options for your Maximo Accoya order.
Request a material quote →